澳门王中王 Job Book 10th edition: checklists and forms

These downloadable resources are related to the 10th edition of the 澳门王中王 Job Book, currently available in hardback from 澳门王中王 Books

These are the downloadable resources which relate to the 10th edition of the 澳门王中王 Job Book.

The 澳门王中王 Job Book fully reflects the 澳门王中王 Plan of Work 2020 and contemporary working practice, providing a systematic operational framework that can be applied to all types of building project and forms of procurement.

To use these templates safely as an intended, it is important to refer to the introductory and supplemental guidance and background notes in the book.

Each document is available to download in two file types: a read-only PDF and an editable Rich Text File (RTF). You should be able to open PDFs with Adobe Reader. Rich Text Files can be opened with any word processing software.

The numbers alongside the file names match the reference in the 澳门王中王 Job Book (10th edition).

Checklists

  • 0: Strategic Definition checklist (, )
  • 1: Preparation and Brief checklist (, )
  • 2: Concept Design checklist (, )
  • 3: Spatial Coordination checklist (, )
  • 4: Technical Design checklist (, )
  • 5: Construction checklist (, )
  • 6: Handover checklist (, )
  • 7: Use checklist (, )
  • P: Procurement checklist (, )

Standard forms and letters

  • 0/F1: Letter to Architect formerly engaged (, )
  • 0/F2: Client care letter (, )
  • 0/F3: Establishing cost rates (, )
  • 0/F4: Project resource planning sheet (, )
  • 0/F5: Initial enquiry questionnaire (, )
  • 0/F6: Construction budget calculator (, )
  • 1/F1: Visits to sites and unoccupied buildings (, )
  • 1/F2: Project plan (, )
  • 2/F1: Agenda for initial design team meeting (, )
  • 2/F2: Budget estimate (, )
  • 2/F3: Project cost monitoring sheet (, )
  • 3/F1: Design change notice and record (, )
  • 4/F1: Document issue register (, )
  • 4/F2: Transmittal for drawing issue (, )
  • 5/F1: Agenda for pre-contract meeting (, )
  • 5/F2: Financial report to client (, )
  • 5/F3: Agenda for CA site progress meeting (, )
  • 5/F4: Report form for predictive site visits (, )
  • 5/F5: Record form for CAs instructions issued (, )
  • 5/F6: Record form for site delays observed (, )
  • 5/F7: Record form for defective work (, )
  • 5/F8: Record form for claims by contractor (, )